Project History
Project Vision
PD&E Study for the Palmetto
- Letter of Transmittal
- Air Quality Technical Memorandum
- Categorical Exclusion (Type II)
- Cost Risk Assessment Final Report
- Final Cultural Resource Assessment Survey
- Contamination Screening Evaluation Report
- Stormwater Management Report Volume 1
- Stormwater Management Report Volume 2
- Stormwater Management Report Volume 3
- Design Traffic Technical Memorandum
- Endangered Species Biological Assessment
- Noise Study Report
- Origin-Destination Study Final Report
- Preliminary Engineering Report Appendix
- Preliminary Engineering Report
- Public Involvement Summary Report
- Traffic Operations Analysis Report
- Value Engineering Study Final Report
- Wetland Evaluation Report
Maria Camacho, Community Outreach Specialist – Construction Project
Phone: (305) 731-7699|E-mail: Maria.Camacho@dot.state.fl.us
Rodolfo Roman, Public Information Project Coordinator
Phone: (305) 640-7437|E-mail: Rodolfo.Roman@dot.state.fl.us
Enmanuel “Manny” Espinal, M.S.E.M., P.E., Resident Engineer - Special Projects
Phone: (305) 807-2481|E-mail: Enmanuel.Espinal@dot.state.fl.us