Project History
Project Vision
PD&E Study for the Palmetto
-
Letter of Transmittal
-
Air Quality Technical Memorandum
-
Categorical Exclusion (Type II)
-
Cost Risk Assessment Final Report
-
Final Cultural Resource Assessment Survey
-
Contamination Screening Evaluation Report
-
Stormwater Management Report Volume 1
-
Stormwater Management Report Volume 2
-
Stormwater Management Report Volume 3
-
Design Traffic Technical Memorandum
-
Endangered Species Biological Assessment
-
Noise Study Report
-
Origin-Destination Study Final Report
-
Preliminary Engineering Report Appendix
-
Preliminary Engineering Report
-
Public Involvement Summary Report
-
Traffic Operations Analysis Report
-
Value Engineering Study Final Report
-
Wetland Evaluation Report
![lines](https://www.826palmetto.com/system/images/front/c_addline.jpg)
Maria Camacho, Community Outreach Specialist – Construction Project
Phone: (305) 731-7699|E-mail: Maria.Camacho@dot.state.fl.us
Kathy McLendon, Public Information Project Manager
Phone: (305) 640-7437|E-mail: Kathy.McLendon@dot.state.fl.us
Enmanuel “Manny” Espinal, M.S.E.M., P.E., Resident Engineer - Special Projects
Phone: (305) 807-2481|E-mail: Enmanuel.Espinal@dot.state.fl.us